• The New Crystal
  • History
  • Location
  • Documents
  • Project Team
Crystal Mountain  


Project Documents


2006 Master PlanPDF

2006 Master Plan (7.4 MB)
Revision date: December, 2006

Master Plan Appendices are available via FTP website.
Username: "Master Plan"
Password: "Crystal"




Official Community Plan and Rezoning ApplicationPDF

Official Community Plan (1.4 MB)
Revision date: June, 2006

OCP SchedulesPDF

Schedule A - Plans*

RZ-B - Resort Base Area Plan (5.1 MB)

RZ-P - Overall Plan (25.8 MB)

RZ-Z1 - Phase 1 Zoning Plan (5.2 MB)

Schedule B - Design Guidelines

Design Guidelines (3.4 MB)

Schedule C - Phasing*

Bed Unit Summary (72 K)

Dwelling Unit Summary (28 K)

Dwelling Unit Summary (28 K)

RZ-PH Overall Phasing Plan (12 MB)

Schedule D - Parking

Parking Summary (32 K)

RZ-PK - Parking Plan (2 MB)

Schedule E - Zoning Bylaw

Proposed Zoning Bylaw (216 K)



OCP AppendicesPDF

Appendix A - Fire

Field Forestry Reports (400 K)

Appendix B - Water

Golder Associates - Groundwater Assessment (5 MB)

Golder Associates - Test Well Drilling (15 MB)

McElhanney - Water Demand Assessment (11 MB)

Appendix C - Traffic

McElhanney - Traffic Impact Assessment (1.5 MB)

Appendix D - Engineering*

PH-1 General Phase 1 Servicing Drawing (0.5 MB)

Appendix E - Archaeological

Archaeological Report (3.5 MB)

Appendix F - Environment

Environmental Assessment Report (6.2 MB)

2001 Addendum Report (1.1 MB)

2006 Addendum Report (4.2 MB)


* Due to file size limitations, not all plans are listed for download via HTTP. Please contact us should you require further information.

Reference Documents

  • NEW: Supplementary Water Demand and Supply Assessment Report (DRAFT), February 2007 (1.1 MB)
  • Letter re: Water Supply Facts from Golder Associates Ltd., October 25, 2006 (48 K)
  • Crystal Mountain "Water Supply Facts" by McElhanney Consulting Ltd., October 23, 2006 (68 K)
© copyright 2002-2007 Crystal Mountain Resort